A new container terminal for MSC PSCA includes a 25-metre-high maintenance shed for straddle carriers. Intermediate platforms allow for inspection and maintenance at different levels.

Challenge

A combination of exceptional techniques was required for this particular type of project, with energy efficiency adding an extra dimension to an atypical context.

Solution

Sophisticated coordination led to smooth completion of the various components. In addition to the standard techniques, overhead cranes, garage tech, and a fuel station are provided. A hybrid concept optimises energy, including free cooling, LED lighting, and PV cells.

Read full report

Client(s)

  • MSC PSA European Terminal

Location

Antwerp, Belgium

Timeline

2017

2019

Expertise Team(s)

  • M&E Engineering

  • View more...

Design Solution(en)

  • Feasibility Study

  • Sustainability Assessment

  • Performance Gap Management

  • Sustainability Tracking

  • View more...

Finished industry doel mpet IMG 0500 2

Even a building as industrial as this is equipped with photovoltaic panels on the roof for renewable energy production and uses free cooling.

Tom De Vroe

senior project engineer M&E, VK architects+engineers

MSC PSA European Terminal has developed a container terminal nearby the Kieldrechtsluis in Antwerp.

The main building contains maintenance and repair workshops for straddle carriers containing combustion engines for driving and hoisting containers. The workshop has a height of 25 meters, with intermediate platforms for maintenance, repair and inspection of the straddle carriers. The buildings also contain a spare parts warehouse, steam washing area, lockers and shower rooms, sanitary facilities, staff facilities and offices.

The workshop facilities include the compressed air installation, storage and distribution of oils and coolants, extraction of welding exhaust gases and extraction of exhaust gases of combustion engines.

The heating production system for building heating and sanitary hot water production includes a hybrid concept of air/water heat pumps in combination with high-efficiency fuel-fired heating boilers. Air handling units for ventilation and heating purposes are equipped with high-efficiency energy heat recuperation systems and free cooling. The supervising and controls of the technical installations and energy plants are controlled from a central building management system. The lighting is based on LED light fittings with DALI control for presence detection and daylight control. The building is equipped with photovoltaic panels on the roof for renewable energy production.

In addition to the maintenance building VK engineered a central fuel storage plant and fuel distribution system for the straddle carriers with automatic registration and supervising system.

Other projects you might like

Do you want to transform tomorrow with ingenuity, eye for detailed aesthetics, and a sense of responsibility?

Check our job openings!

Would you like to get to know us? Say hi & maybe we will be partners for the long haul.

Made byBits of Love