Les Viviers Hospital

BE

About

Belgium’s largest non-university, new-build hospital centralises five former campuses. Like a citadel, this healthcare campus watches over the city of Charleroi and the wider region.

Challenge

The client, Grand Hôpital de Charleroi, wanted a campus designed according to the functional zoning model method for maximum future orientation. In addition, the new hospital had to be built with respect for the characteristic landscape of this mining region.

Solution

The hospital is logically conceived via relationship matrices, spot diagrams, and flow charts for optimal care efficiency and maximum flexibility. The campus is surrounded by 11 hectares of parkland, a healing environment for the users, and a familiar environment for the local wildlife.

Read full report

Client(s)

  • Grand Hôpital de Charleroi

Architect(s)

  • VK architects+engineers
  • RESERVOIR A

Location

Charleroi, Belgium

Timeline

2013

2024

Expertise Team(s)

  • Acoustical Engineering

  • Architecture

  • Digital Engineering

  • M&E Engineering

  • Structural Engineering

  • Sustainable Design

  • View more...

Design Solution(en)

  • Masterplanning

  • Feasibility Study

  • Life Cycle Cost Analysis

  • Building Simulations

  • Occupancy Evaluation Management

  • View more...

Hospitals charleroi ghdc 6

An important criterion was the application of the “layers” method in structuring the hospital, creating a logical and flexible campus, stimulating an efficient organization of care.

Erik Vereecken

project director healthcare, VK architects+engineers

The Charleroi Grand Hospital is dealing with a dispersed and outdated infrastructure throughout the city. The temporary association VK – RESERVOIR A was proclaimed laureate of the design competition, submitting a future proof and flexible design.

An important criterion was the application of the “layers” method in structuring the hospital. This creates a logical and flexible campus, stimulating an efficient organization of care. This optimal structural functionality also allows for a hybrid approach, because it follows the organization of care at hand, be it per pole, per pathology or per activity center. The programming was completed by means of flow charts and circulation diagrams, in order to create logical entities around specific services and departments. At the same time, the design avoids the monolithic character typical of large hospitals. In breaking up the entire structure, the hospital is reduced to a human scale.

Furthermore, the typical landscape of the Sambre and Meuse valley is optimally met. The coal tips (terrils in French), witnesses of the rich industrial past of the mining region, have grown into green mountains, inhabiting a particular fauna and flora. The Terril des Viviers will offer the new hospital a place, embedding it into a green environment as a healing place. Moreover, from this position it will hover above the city’s ring way, functioning as a city gate, a citadel guarding the health of the city and its inhabitants.

Visit the website dedicated to the project

Other projects you might like

Do you want to transform tomorrow with ingenuity, eye for detailed aesthetics, and a sense of responsibility?

Check our job openings!

Would you like to get to know us? Say hi & maybe we will be partners for the long haul.

Made byBits of Love