GH Sint-Jan, Bruges, OR

BE

About

This expansion with three operating theatres according to international standards emerged as a pilot project for AZ Sint-Jan and introduced new techniques in Belgium for the design of operating theatres.

Challenge

The project is more than an extension of the existing operating theatre, as a buffer for renovation works. This pilot project was to trigger innovation for operations.

Solution

Modular stainless steel walls with flat installation options maximise hygiene. Laminar flow guarantees air quality ISO5 and floor-to-ceiling sliding glass doors connect the 3 rooms.

Read full report

Client(s)

  • AZ Sint-Jan Brugge-Oostende AV

Architect(s)

  • VK architects+engineers

Location

Bruges, Belgium

Timeline

2010

2011

Expertise Team(s)

  • Architecture

  • M&E Engineering

  • Structural Engineering

  • View more...

Design Solution(en)

  • Feasibility Study

  • VR Simulations

  • Building physics

  • View more...

Hospitals brugge azsintjan operationroom 6 web

The partition walls and ceilings use a modular stainless steel-system for maximum flexibility.

Peter Deneut

director healthcare, VK architects+engineers

VK was responsible for the operating block’s extension and renovation in the Bruges Saint John General Hospital.

An extension with 3 "Hi-tech" operating rooms enables to upgrade the entire block without reducing capacity. Furthermore, this extension optimizes the flows and limits the walking distances. The extension functions as a case-study, analyzing the needs and habits of users and integrating the latest technological developments. The results will be applied to the entire operating block. This pilot project, both architecturally and technically, introduces many new techniques in Belgium, while meeting the strictest international standards.

The operating rooms demonstrate a new concept as three separate rooms, or as "landscape" operating rooms connected with each other by sliding glass doors.

The partition walls and ceilings use a modular stainless steel-system for maximum flexibility. The walls are clad with glass or coated panels that house the control panels (a glass panel with touch screen), embedded seamlessly for maximum hygiene.

Air quality (ISO 5) is guaranteed with a conducting laminar flow of 3 by 3 meter. A temperature gradient and various temperature zones enhance the laminar flow. Wall heating compensates for the loss of temperature.

Medical equipment is suspended from a square support around the plenum. An additional plenum for sterile sets minimizes contamination risks. All the sliding doors are glazed from floor to ceiling to ensure maximum visibility and light. The operating rooms are located behind the façade, so they can enjoy natural light. Privacy and solar protection are provided by built-in slats.

Other projects you might like

Do you want to transform tomorrow with ingenuity, eye for detailed aesthetics, and a sense of responsibility?

Check our job openings!

Would you like to get to know us? Say hi & maybe we will be partners for the long haul.

Made byBits of Love