Ensor Towers I and II

BE

About

The Ensor Towers new-build project is located in the Oosteroever district of Ostend and offers around 200 apartments. With views of the sea, city, harbour, dunes, and the new Ensor Park, the towers give a new energy to Ostend’s skyline.

Challenge

A striking appearance and thorough stability are central to these twin towers. Stedec, part of VK architects+engineers, is responsible for the stability study of the Ensor Towers, and the entire site as well.

Solution

To optimise the stability of the façade, there are two slender steel columns on each floor, for which a specific steel coupling was designed. The implementation of sustainable, high-quality materials generates an exclusive living atmosphere.

Read full report

Client(s)

  • Versluys Groep

Architect(s)

  • EL architects

Location

Ostend, Belgium

Timeline

2018

2023

Expertise Team(s)

  • Façade Engineering

  • Structural Engineering

  • View more...

Design Solution(en)

  • Masterplanning

  • View more...

Celd visual residential oostende ensortowers web 08

A high degree of prefabrication was used in the construction. The façade consists of full prefabricated walls.

Koen Coelus

technical director buildings, VK architects+engineers

The new Ensor Towers project, located in the Oosteroever district of Ostend, offers around 2 times 100 flats. With views of the sea, city, harbour, dunes and the new Ensor Park, the towers will give a new élan to the skyline of Ostend. Sustainable quality materials were used to ensure an exclusive living atmosphere.

VK architects+engineers took care of the structural engineering study of both towers, but also of the entire site. The twin towers consist of 26 building layers. A high degree of prefabrication was used in the construction. The façade consists of full prefabricated walls, which were made as inverted U-frames, and which each connected to the parapet. The floor slabs were poured between the prefabricated walls. In the façade, there are 2 slender steel columns (200x200 mm) on each floor, for which a specific steel coupling was designed.

The construction of tower 1 started in 2018 and was completed in 2021. The execution of tower 2 started in 2020 and will be finished in 2023.

Other projects you might like

Do you want to transform tomorrow with ingenuity, eye for detailed aesthetics, and a sense of responsibility?

Check our job openings!

Would you like to get to know us? Say hi & maybe we will be partners for the long haul.

Made byBits of Love