An automated 40-metre high warehouse provides space for 6,000 refrigerated pallets and 24,000 pallets at ambient temperature. The new warehouse connects the 2 production zones on the existing Alpro site by means of a conveyor system.

Challenge

The challenge of this project is to fit the storage and logistics flows into the existing Alpro site, in order to stock finished products completely onsite and store them externally.

Solution

Thanks to a coneyor system, the warehouse is connected to the 2 production zones on the existing Alpro, thus automatically transporting the pallets to the high-bay warehouse. After a profile check, they are intelligently distributed to the 9 crane aisles.

Read full report

Client(s)

  • Alpro

Location

Wevelgem, Belgium

Timeline

2016

2017

vk-factory-warehouse-alpro-01

The new automated warehouse has a throughput of 750,000 pallets per year, and is capable of handling both 800x1200mm and 1000x1200mm pallets.

Roeland Bellens,

Director of logistics, VK architects+engineers

Alpro's new warehouse is 40m high and accommodates 6,000 refrigerated pallets and 24,000 pallets at ambient temperature. These 30,000 pallets are fed in and out using 9 automatic pallet cranes with 2 load handling devices. The new automated warehouse has a throughput of 750,000 pallets per year and is capable of handling both 800x1200mm and 1000x1200mm pallets.


The warehouse is connected to the 2 production zones on the existing Alpro site by means of a conveyor system. Immediately after production, pallets are automatically transported to the high bay warehouse and, after a profile check, are intelligently distributed to the 9 crane aisles.

Output orders are forwarded from Alpro's ERP system to the WMS, which translates them into transport orders. Subsequently, pallets are exported by means of the 9 automatic pallet cranes and transported over a conveyor system to the assigned outbound gates where they are staged. Finally, when a transport is fully executed, the assigned pallets are manually loaded.

Besides the regular full pallet flow, there is also provision for preparing mixed pallets using pallet-to-pallet picking stations. These mixed pallets are transported directly to the outbound gates or temporarily stored in the high-bay warehouse. Adjacent to the high-bay warehouse, a traditional warehouse was built for 10,000 pallets of packaging and R&D goods

  • 10,500 m² land area
  • 40m construction height
  • 29,500 pallet locations
  • 9 multi-carrier ASRS pallet cranes
  • Temperature control in multiple zones and regimes
  • Connection production - warehouses
  • Conventional warehouse for storage of packaging materials

In this project, Van Looy Group was responsible for the conceptual design, engineering and realisation of the new automated warehouse, for both the logistics systems, special techniques and the building. Construction and project managers from Van Looy Group ensured smooth realisation within the predefined time, scope and cost baselines.

Our expertise & responsibilities in the project

  • Logistics design
  • Engineering construction and special techniques
  • General contracting

Do you want to transform tomorrow with ingenuity, eye for detailed aesthetics, and a sense of responsibility?

Check our job openings!

Would you like to get to know us? Say hi & maybe we will be partners for the long haul.

Made byBits of Love